King post retaining walls/ Contiguous Bored Pile walls

Our case studies provide great examples of some of the outstanding work we have undertaken. These case studies cover soil nails, soil nailing, bearing tension piles, restricted access piles, ground anchors, drilling and grouting, contiguous bored piled walls - other case studies are available. Click on the case study titles for further details on the individual projects.


Garforth, Leeds

Kingpost Retaining Wall, Bored Piles
Remedial work to arrest slip of major arterial road , installation of 50 king posts over a non contiguous length of  200 metres
Read More>

Download Case Study


Saddleworth & Stockport

Contiguous bored pile wall

Several local authorities in Manchester were embarking on a programme of strengthening retaining walls. ...

 

Read More >

Download Case Study


Holden Wood

King post wall
Pennine drilled, grouted and installed a series of king posts to facilitate excavation works to be undertaken at the Holden Wood reservoir...

 

Read More >

Download Case Study


Hereford

king post ground anchors
Pennine drilled, grouted and installed a series of king posts and ground anchors to enable a new pedestrian footbridge to be constructed over the River Wye. ..

 

Read More >

Download Case Study

 

Case Studies > King Posts & Contiguous Bored Pile Walls